The 11Kv EPC PACKAGE ( Tilenga Project)

UGANDA - EASTAFRICA

TILENGA PROJECT 2023 - 2024

The 11Kv EPC Package

The Project involved the;
 *Design and installation of the 11kV electrical distribution systems to support project operations
*Engineering design, procurement of materials, and equipment for the electrical power distribution system.
*Construction and commissioning of the electrical power distribution system to ensure safe and efficient operation

Reliable Generator-powered solutions, ensuring uninterrupted electricity for industrial and remote applications where grid power is unavailable or unstable

The 11kV EPC package for the Tilenga Project prioritizes quality through meticulous engineering design, stringent procurement processes, and rigorous construction and commissioning protocols to ensure reliable and efficient electrical power distribution